Ironwoods: Done and dusted
Thursday, December 22nd, 2011
Earlier this week, blacksmith Lynda Metcalfe and I drove to Chapel Hill to put the finishing touches on our collaboration, the Ironwoods neighborhood sign. It was satisfying to see this project through; discussions with the homeowner’s association had started a year ago November. The time invested was well spent. This sign is a work of art.

The sign sits on an island and is visible to traffic in both directions. Each side of the sign has its own flow of vines and is its own piece.

Lynda’s work has great depth. The letters are raised from the back panel and vines wind their way behind the letters, poking through here and there.


In this image from Lynda’s shop, you can see how she lined up the lettering on each side so that one set of fasteners reached through to catch the word Ironwoods running in both directions. Lynda’s primary focus in architectural metalwork; it was great to work with another artisan with such a strong construction ethos. We both aspired to create something strong and beautiful. Craftsmanship should be more than pretty.
(photo by Lynda Metcalfe)

All in all, the experience of working at Ironwoods was unlike any other I’ve ever had in my career. They know how to treat craftspeople. Concerned neighbors brought out orange cones to protect us from distracted drivers. Virginia made me soup. A kindly stranger delivered me hot chocolate (with whipped cream!) on a cold day. Ethan and Logan supplied me with marbles, since I forgot my own back home. I am sincerely grateful for the kindness and enthusiasm shown for the process and the finished product. It is a great joy to create work for people who appreciate it.
Special thanks are owed to Matthew Feldt who saw this project through from a seed of an idea to a fully grown vine. He navigated the design process with grace, championed the project from start to finish and lent his strong back, his photographic eye and even his garage to the effort. The sign doesn’t happen without Matthew. Thank you.
All of the photographs in this blog posting, unless otherwise noted, are by Matthew Feldt.












I drove down on Monday and the stone arrived the next morning. It was a soggy day, but mild compared to the weather Gainesville had endured all summer. It never topped 90 on my whole trip, but the week before it had been pushing 100.
It took me a day and a half to pack up all the stones for travel. I used cardboard between each layer on a pallet and shimmed under stones to keep everything level and tight. Lots of strips of cardboard went between the stones on each layer, so that there wouldn’t be any movement and vulnerable points wouldn’t be broken. Then I shrink-wrapped the heck out of it. It all traveled beautifully; there was no damage to any of the 105 pieces. Thanks to Dennis at Dayrunner Systems for taking such care with my delivery.





