Radial Steps: Sunny day column
February 24th, 2010
The radial steps are all in place, awaiting some serious clean-up and grouting. The two columns that frame the steps are up to height, awaiting caps. The third column in within inches of completion. I have shifted my focus to the drystone retaining wall between the columns.
PIctured above: looking down one of the columns next to the steps.

February 25th, 2010 at 6:13 pm
I really like the contrast here between the clean, crisp lines of the steps and the slightly rustic edge to the stone of the columns. Smart job.